Skip to main content

Aletheia is a new-country project in its founding phase. It is not a recognised state, holds no territory, exercises no legal authority, and issues no passports, legal currency or citizenship. Read our status & disclaimers →

AletheiaChain Mainnet Beta
Slot time: 500 ms
About AletheiaChain→
Ports & Coastal Works
Vision

Ports & Coastal Works: Design Studies

Design studies for the long term: a deepwater port, a concentric capital, coastal protection and digital links. None is under construction. Each would be built at sea, on platforms Aletheia owns, beginning with a single pilot platform.

Vision · Design Studies

Long-Term Public Works

Any construction would follow Eurocode and maritime classification standards.

Maritime Logistics & TradeVision

St. Brendan Deepwater Autonomous Port

A design study for an automated container terminal, sized for the largest container vessels and fully electrified. No site has been chosen and no works have begun.

Design Parameters:
Design target: deepwater berths
Design target: 2.5M TEU a year
Automated electric vehicles
Bonded free-port zone
Design study · Port NicholasView the Design Study
Civic & Urban ArchitectureVision

Antioch Concentric Capital Urban Plan

A design study for Antioch: administrative, legislative, residential and academic zones in concentric rings, with zero-emission underground transit.

Design Parameters:
Hexagonal Central Assembly
Subterranean Maglev Loop
100% Pedestrian Surface
LEED Platinum Standards
Design study · AntiochView the Design Study
Oceanic Civil ProtectionVision

Seawall & Storm Surge Barrier

A design study for marine concrete caissons to withstand a 1-in-200-year storm surge, for the foundations of Aletheia’s fixed platforms.

Design Parameters:
Designed to maritime classification rules
Integrated wave turbines
Self-healing bio-concrete
Automated tidal floodgates
Design study · Civil protectionView the Design Study
Digital ConnectivityVision

Subsea Fibre & Satellite Gateway

A design study for submarine cable landing stations linked to major European internet exchanges, backed by satellite ground stations.

Design Parameters:
High-capacity subsea fibre
Low latency to European exchanges
Resilient data centres
Satellite backup
Design study · Digital connectivityView the Design Study

Built on Our Own Platforms

These works would be built at sea, on platforms Aletheia owns. No tenders or investments are offered.